February 2, 2023

Yves Construction Update

🏗️ Top down Slab 2 poured 06/01/23

🏗️ Downturn beam for stormwater connection point poured 17/01/23

🏗️ Pile trimming complete

🏗️ Subgrade preparation for Tope down slab pour 3 underway

🏗️ Top down slab 3 concrete blinder pour due to be completed late this week

🏗️ Top down slab 3 concrete pour due early Feb

🏗️ Tower Crane concrete base pour due mid Feb